Hytrans HydroSub 150 Mobile HVP Fire System Deployment

Hytrans HydroSub 150 Mobile HVP Fire System Deployment

Hytrans HS150 mobile high volume pump with HVP fire system installation, high speed hose laying and hose recovery with HRU;
  This system holds up to 2,000m of 6" / 152mm hose. Opens at speeds up to 40 km/h.
  Full deployment takes approximately 15 minutes.
  Full recovery takes less than 1 hour.
  HS150 hydrosub mobile water supply system, which provides 3,500 lpm of water at 10 bar, the system can deliver up to 8,000 lpm of water at lower pressure.
  High speed hose laying at speeds up to 40 km/h with 6" / 150mm LDH (large diameter hose),
  HRU, mechanized hose recovery with Hytrans HRU (Hose Recovery Unit),
  Ground fire monitor as water attack.
  Hytrans Ramp for 6" hose - the hose is only gently squeezed into an oval that does not restrict water flow. The Crimp Ramp is built for the demand for consistently high volumes of heavy-duty traffic, including trucks, low-haul buses and general cars.

Facebook Comments

More heavy-equipment Video